Progress Report Sample | Mep Work

A robust report does not just say what was done; it highlights where it was done. This helps different trades coordinate. For example, knowing that HVAC ductwork is 80% complete on the 3rd floor tells the ceiling contractor they can begin their prefabrication.

MEP systems account for a significant portion of a building’s total cost—often ranging from 20% to 40% of the total budget. A detailed progress report is required to substantiate Applications for Payment (IPC). Without a granular report, owners may withhold payments, claiming work is unverifiable. mep work progress report sample

| Material | Required | Delivered | On Site | Shortage | Next Delivery | |----------|----------|-----------|---------|----------|----------------| | ¾” EMT conduit (sticks) | 800 | 750 | 120 | 50 | April 20 | | 4″ PVC pipe (6m length) | 150 | 150 | 30 | 0 | – | | Chilled water insulation | 400 m² | 300 m² | 80 m² | 20 m² | April 22 | | Cable trays (straight sections) | 200 | 180 | 20 | 20 | April 19 | A robust report does not just say what

When you adapt this "mep work progress report sample" for your own use, keep the following rules in mind: MEP systems account for a significant portion of

Sarah Johnson MEP Site Engineer

A log of current bottlenecks—such as material delays, pending drawings, or labor shortages—and the specific actions taken to resolve them.